This site uses technical and analytics cookies to improve the reading experience. By continuing to browse, you accept their use.

The Panama Metro: lines, fares, hours, how to pay and Line 3 to West Panama

The Panama Metro: lines, fares, hours, how to pay and Line 3 to West Panama

In short: the Panama Metro is the only metro in Central America. It has two lines in operation, Line 1 since 2014 between Albrook and San Isidro and Line 2 since 2019 between San Miguelito and Nuevo Tocumen, with a branch to the airport. The fare is 0.35 balboas on Line 1 and 0.50 on Line 2, paid with the rechargeable card that also works on the buses. It carries around 250,000 passengers a day. Line 3, a 25-kilometre monorail to West Panama, is under construction and will open in stages between 2027 and 2028.

The two lines in service

Line Route Opened Stations Fare
Line 1 Albrook – San Isidro, along Vía España and the Transístmica 2014 (extended 2015) 15 B/. 0.35
Line 2 San Miguelito – Nuevo Tocumen, along Domingo Díaz avenue, with a branch to Tocumen airport 2019 (branch 2022) 16 B/. 0.50

The two lines cross at San Miguelito station. A trip combining both costs 0.85 balboas, the sum of the two fares. The trains are automated, run every 3 to 6 minutes at peak times and the average speed is 50 km/h.

Hours

  • Monday to Friday: 5:00 to 23:00.
  • Saturdays: 5:00 to 22:00.
  • Sundays and holidays: 7:00 to 22:00.

How to pay

The fare is paid with the Metro card, rechargeable at stations, authorised shops and online. The same card works on Metrobús, the city’s bus system, with a fare of 0.25 balboas per trip and 1.25 on the expressways. Pensioners and people with disabilities have discounts with the corresponding card. Coins and notes are not accepted at the turnstiles.

Key fact: the Panama Metro charges 0.35 balboas on Line 1 and 0.50 on Line 2, and is the only metro system in Central America. It carries between 240,000 and 280,000 passengers every day.

Line 3 to West Panama

Line 3 is a 25-kilometre monorail with 11 stations that will link Albrook with Ciudad del Futuro, in Arraiján, crossing the Canal through a tunnel under the waterway. It is the first train to connect West Panama with the capital and will replace part of the traffic on the Bridge of the Americas and the Centennial Bridge. Overall progress is around 69% in 2026: the elevated viaduct is at 86% and the underground section at 68%.

Opening will be in phases: the elevated section between Ciudad del Futuro and Panamá Pacífico has a completion date of April 2027, and the full section to Albrook of October 2028. It is estimated to carry 160,000 passengers a day from day one, close to Line 2’s figure.

What changes for those living or investing in West Panama

  • The Arraiján–Albrook journey, which today can exceed an hour by car, will drop to about 30 minutes.
  • Residential projects near the future stations (Nuevo Chorrillo, Vista Alegre, Ciudad del Futuro) already use Line 3 as a selling point.
  • A second phase to La Chorrera is planned.
Frequently asked questions

How much does the Panama Metro cost?

0.35 balboas per trip on Line 1 and 0.50 on Line 2. A trip combining both lines costs 0.85. It is paid with the rechargeable Metro card, which also works on Metrobús.

What time does the Panama Metro open and close?

Monday to Friday from 5:00 to 23:00, Saturdays from 5:00 to 22:00 and Sundays and holidays from 7:00 to 22:00.

When does Line 3 of the Panama Metro open?

In phases: the elevated section between Ciudad del Futuro and Panamá Pacífico in 2027 and the full section to Albrook in 2028, according to the Panama Metro’s schedule.

Related articles

Sources

Radar answers

Ask about this article

Type your question and we will show you the answer inside this article or in other Radar Panamá publications.

Was this article useful?
By Daniela Bohórquez

Daniela Bohórquez is a writer at Radar Panamá. Venezuelan, 30, she writes about travel, tourism and business, with special attention to reviews of destinations, hotels and services. She lives between Panama, Italy and New York, which gives her a comparative view of how business is done in each market.

No widgets found. Go to Widget page and add the widget in Offcanvas Sidebar Widget Area.